Renovation salvage

What to salvage before a renovation

A Metro Vancouver salvage checklist for cabinets, doors, fixtures and other reusable building materials, with local destinations to check before removal.

Start before the crew takes anything out

Walk the site with the contractor and select pieces that can be removed intact. Photograph each one and note dimensions, defects, quantity and when it will be ready. Have the contractor check permit and hazardous-material requirements before removal begins. Reserve a dry staging spot and arrange a destination for each accepted item. Metro Vancouver construction and demolition toolkit

Match the item to a destination

ItemWhat to documentWhere to check
Kitchen or bathroom cabinetsPhotograph the full layout. Save matching doors, drawers, hinges and handles. Note water or cabinet-box damage.ReStore lists cabinets. Maple Ridge New & Used lists both sets and individual units, subject to inspection. ReStore criteria · Maple Ridge criteria
Interior and exterior doorsGive the slab dimensions, mounting style and condition of the frame or glass. Label any hardware that belongs with it.Maple Ridge New & Used reviews slabs and prehung doors. Its list excludes broken or damaged doors. Door and window criteria
Fixtures and vanitiesRecord working condition, missing parts and whether a countertop comes with its base.ReStore lists plumbing items and the exception for bathroom vanity tops with their cabinets. Ask what it can take before transport. Plumbing and countertop criteria
Sound lumber and trimList lengths, cross-sections and condition. Tell the recipient about paint, fasteners or any suspected treatment.Habitat lists lumber and trim for review. Metro Vancouver's toolkit lists further pathways for reusable material and recycling. ReStore material list · Regional toolkit

What a local deconstruction case measured

The City of Vancouver reports that a 1930 Dunbar house kept 98% of its building materials out of landfill through reuse and recycling combined. Give each of those outcomes its own line in your records so a reader can see what was kept intact and what was processed as recycling. City of Vancouver deconstruction case studies

Save an item inventory, recipient confirmation and any weight tickets for the material actually weighed. Document the handoff date and the destination before closing the job.

Back to all stories