Renovation salvage
What to salvage before a renovation
A Metro Vancouver salvage checklist for cabinets, doors, fixtures and other reusable building materials, with local destinations to check before removal.
Start before the crew takes anything out
Walk the site with the contractor and select pieces that can be removed intact. Photograph each one and note dimensions, defects, quantity and when it will be ready. Have the contractor check permit and hazardous-material requirements before removal begins. Reserve a dry staging spot and arrange a destination for each accepted item. Metro Vancouver construction and demolition toolkit
Match the item to a destination
| Item | What to document | Where to check |
|---|---|---|
| Kitchen or bathroom cabinets | Photograph the full layout. Save matching doors, drawers, hinges and handles. Note water or cabinet-box damage. | ReStore lists cabinets. Maple Ridge New & Used lists both sets and individual units, subject to inspection. ReStore criteria · Maple Ridge criteria |
| Interior and exterior doors | Give the slab dimensions, mounting style and condition of the frame or glass. Label any hardware that belongs with it. | Maple Ridge New & Used reviews slabs and prehung doors. Its list excludes broken or damaged doors. Door and window criteria |
| Fixtures and vanities | Record working condition, missing parts and whether a countertop comes with its base. | ReStore lists plumbing items and the exception for bathroom vanity tops with their cabinets. Ask what it can take before transport. Plumbing and countertop criteria |
| Sound lumber and trim | List lengths, cross-sections and condition. Tell the recipient about paint, fasteners or any suspected treatment. | Habitat lists lumber and trim for review. Metro Vancouver's toolkit lists further pathways for reusable material and recycling. ReStore material list · Regional toolkit |
What a local deconstruction case measured
The City of Vancouver reports that a 1930 Dunbar house kept 98% of its building materials out of landfill through reuse and recycling combined. Give each of those outcomes its own line in your records so a reader can see what was kept intact and what was processed as recycling. City of Vancouver deconstruction case studies
Save an item inventory, recipient confirmation and any weight tickets for the material actually weighed. Document the handoff date and the destination before closing the job.